亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
SPORTS
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service
China Calendar


Hot Links
China Development Gateway
Chinese Embassies

Tunnels Under Yellow River for Water Diversion Project

Construction of two tunnels beneath the Yellow River, the country's second longest, middle route of the giant south-north water diversion project, will start in August, according to the information from the department in charge of the tunnel.

The entire project of two tunnels, with a designed length of 19.3 km, including two 3.5-km-long tunnels, will be situated 30 km upstream the Yellow River Bridge at Zhengzhou, capital of Henan Province.

The tunnels will have a designed water flow capacity of 265 cu m per second each, or a maximum flow capacity of 320 cu m per second each. It will cost 3.1 billion yuan (US$382 million) and will take 51 months to complete.

The entire tunnel project requires a land requisition of 684 hectares and relocation of 386 residents. Up to now, the preparatory work, including construction of infrastructure at the construction site, and land requisition is moving swiftly.

The tunnels are two of the key works to be finished for the middle route of the south-to-north water diversion project, designed to carry water from the Yangtze River, China's longest, in the country's water-rich southern areas to its arid north.

The south-north water diversion project was first imagined by former Chinese leader Mao Zedong in 1952. After protracted debates that lasted nearly a half century, the State Council sanctioned the ambitious project in December 2002.

It plans to divert 44.8 billion cubic meters of water annually from the Yangtze, China's longest river, through eastern, middle and western routes to relieve water shortages in north China by 2050.

The construction of the project's eastern route began in December 2002 and is expected to supply water to Shandong Province by 2007. The central route began in December 2003 and is due to supply water to Henan and Hebei provinces, Beijing and Tianjin by 2010. The western route is scheduled to begin construction in 2010. The massive water diversion project will cost 500 billion yuan (US$61.65 billion).

(Xinhua News Agency August 1, 2005)

Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
  • <th id="fomfv"></th><noscript id="fomfv"></noscript>

    <fieldset id="fomfv"><font id="fomfv"></font></fieldset><sup id="fomfv"><menuitem id="fomfv"></menuitem></sup>

    1. <dfn id="fomfv"></dfn>
        1. 亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放 毛片无码免费无码播放 国产精品美女乱子伦高潮 久久男人av资源网站无码 亚洲精品中文字幕AV一本 国产成年无码V片在线 特级毛片直接看不用下载 亚洲深夜无码视频