亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放

Home / Environment / News Tools: Save | Print | E-mail | Most Read
Construction of New Hydropower Plant on Yalong River Begins
Adjust font size:

China started construction of another major hydropower station, designed to have an installed capacity of 4.8 million kilowatts, in the southwestern province of Sichuan on Tuesday, according to local sources.

 

Known as the second-tier hydropower plant at Jinping, a bend in the Yalong River, the project involves a total investment of 29.8 billion yuan (about US$3.73 billion). It is scheduled to be completed in 105 months.

 

The developer, the State Development and Investment Corporation, said the new plant is the largest of a series of hydropower plants to be constructed on the 1,571-km-long Yalong River.

 

Construction of Ertan hydropower station, located at the lower reaches of the Yalong River and with an installed capacity of 3.3 million kw, has been completed.

 

Construction of the first-tier hydropower plant at Jinpin, with a designed installed capacity of 3.6 million kw, began in November last year. It is expected to be completed in 2014.

 

(Xinhua News Agency January 31, 2007)

Tools: Save | Print | E-mail | Most Read

Related Stories
China to Build New Hydropower Plant on Yangtze River
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號(hào)
  • <th id="fomfv"></th><noscript id="fomfv"></noscript>

    <fieldset id="fomfv"><font id="fomfv"></font></fieldset><sup id="fomfv"><menuitem id="fomfv"></menuitem></sup>

    1. <dfn id="fomfv"></dfn>
        1. 亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放 毛片无码免费无码播放 国产精品美女乱子伦高潮 久久男人av资源网站无码 亚洲精品中文字幕AV一本 国产成年无码V片在线 特级毛片直接看不用下载 亚洲深夜无码视频