亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
THIS WEEK
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies

Safety Casing Test Ended at Qinshan Nuclear Power Station
Qinshan Nuclear Power Station is the heavy-water reactor nuclear power station, the first of its kind dedicated to commercial use in China. The test of the safety casing for No.2 generating unit, the 3rd phase of Qinshan Project was brought to an end on Jan. 28, 2003.

The leakage indicates only 0.132 percent reactor volume/day, which is 26.4 percent of the acceptance standard. Though the period for testing was only 8 days the test has come up to the acceptance requirement.

The test has created two world records in the safety casing for nuclear power stations of the same type, the lowest in leakage and the shortest in testing period. This marks that the engineering quality of smooth cylindrical casing for nuclear power station and its management in China has come to the forefront of the world.

The report pointed out that among the same type of nuclear power stations in the world the lowest leakage record was scored by No.1 generating unit of Qinshan Nuclear Power Station, registering the world record of 0.210 percent of reactor volume/day.

The safety-casing test is the biggest single item test for the nuclear power station in the regulating and testing period. It has things to do with many units and is faced with complicated preparations beforehand, which would affect many systems with greater unanticipated risks.

The test was conducted jointly by Qinshan No.3 Nuclear Power Co. Ltd. and the Canadian Atomic Energy Co., Ltd. The test was aiming at proving that the encapsulation of the reactor workshop can meet with the designed requirement supposing the accident is going to happen under the designed basic conditions. The acceptance standard of the test is that under the designed standard pressure of 124 kilo-pa the leakage won't exceed 0.5 percent of the reactor volume/day.

(People?s Daily January 31, 2003)

China's 1st Heavy Water Generator Starts Working
Qinshan III-Stage Heavy Water Nuclear Reactor Trial Run Successful
PICC Insures Nuclear Power Station
Nuclear Plant Achieves Milestone
China-built Nuclear Plant Runs at Full capacity
China to Develop Its Nuclear Sector
China's First Nuclear Plant Begins to Issue Regular Environmental Monitoring Results
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
  • <th id="fomfv"></th><noscript id="fomfv"></noscript>

    <fieldset id="fomfv"><font id="fomfv"></font></fieldset><sup id="fomfv"><menuitem id="fomfv"></menuitem></sup>

    1. <dfn id="fomfv"></dfn>
        1. 亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放 毛片无码免费无码播放 国产精品美女乱子伦高潮 久久男人av资源网站无码 亚洲精品中文字幕AV一本 国产成年无码V片在线 特级毛片直接看不用下载 亚洲深夜无码视频