亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放

 

Remarkable Achievements in 60 Years: Underpinnings of Rapid Economic Growth

0 CommentsPrint E-mail China.org.cn, September 25, 2009
Adjust font size:

(III) Improvement in Energy Technologies and Equipments The energy technologies stayed at a low level in China in early years following its founding. After introduction of foreign technologies and development of proprietary technologies in the past 60 years, in particular in the 30 years' reform and opening up, China has established a technological system suitable for its energy development.

A complete technological system has been created for the oil and gas industry spanning exploration, development, engineering, construction, production and processing. China enjoys a leading position in the world in terms of exploration and development of complicated fault blocks, and enhancement of oil field recovery.

 

 Offshore Oil Production



China is capable of designing, constructing, equipping and managing 10 million t/y open-pit coal mines as well as large- and medium-sized mining areas. Mechanized mining equipment packages have been widely used; the fully mechanized mining rate of large state-owned mines exceeded 80% in 2007, compared with 65% in 1990.

 

 Working Face of 10 Million t/y Mine



The dominant capacities of individual thermal power units increased from 10,000 KW and 100,000 KW in 1978 to the current 300,000 KW and 600,000 KW, with 1million KW critical and super-critical units becoming the next generation of dominant source. The last unit at the let bank of Three Gorges Hydropower Station reached a localization level of 80%, symbolizing China's leading position in design and manufacturing of large hydropower units. Proprietary technologies and equipments have been used in nuclear power at a faster pace. China has become capable of independently design, manufacturing and construction of 1 million kW pressurized water reactors. China is also capable of making 500 kV DC transmission equipments; 750 kV pilot project has been completed and put into service; ±800 kV DC and 1,000 kV AC pilot projects were commenced. The power grid development has proceeded into a new stage of massive cross-province transmission and nationwide interconnection.

 

 Ultra-high Voltage (UHV) Power Transmission



Though competitive bidding for license of large wind farms and importation of technologies, China-made 1.5 MW wind turbines have been massively put into service, reaching a proprietary rate of 86% and helping reducing the capital and operation costs of wind farms. 3 MW and 5 MW turbines are now under research. Technologies have also been improved greatly in development and use of solar and biomass energies.

 

Offshore Wind Turbine Erection 



   Previous   1   2   3   4   5   6   Next  


Print E-mail Bookmark and Share

Comments

no comments.

Add your comments...

  • Your Name Required
  • Your Comment
  • Comments are moderated and generally will be posted if they are on-topic and not abusive.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
  • <th id="fomfv"></th><noscript id="fomfv"></noscript>

    <fieldset id="fomfv"><font id="fomfv"></font></fieldset><sup id="fomfv"><menuitem id="fomfv"></menuitem></sup>

    1. <dfn id="fomfv"></dfn>
        1. 亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放 毛片无码免费无码播放 国产精品美女乱子伦高潮 久久男人av资源网站无码 亚洲精品中文字幕AV一本 国产成年无码V片在线 特级毛片直接看不用下载 亚洲深夜无码视频